Question: 7 . ( 2 0 points ) A fabrication plant operates a single process technology with the following data: Layer Actual CT Std Dev of
points A fabrication plant operates a single process technology with the following data:
Layer Actual CT Std Dev of Actual CT Standard CT
Layers through end with a photo step, while layer ends at fab out.
In a computer simulation of the plant, the average number of lots being processed at any given
time was
a points What was the average active WIP level in the simulation?
b points What production rate was assumed in the simulation?
c points Assume the target cycle time is days and the production rate is the same as in
the simulation. Recommend target WIP levels by layer.
d points Suppose there are two hour shifts per day and suppose actual WIP distribution
at the start of a shift is as follows:
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock