Question: 7 . 8 An earthmoving contractor encounters a trap - rock formation at shallow depth in a cut. Seismographic tests indicate a seismic velocity of
An earthmoving contractor encounters a traprock formation at shallow depth in a cut. Seismographic tests indicate a seismic velocity of for the material On this basis, it is proposed to rip the rock with a hp crawler tractor. Estimate the production in bcy for fulltime ripping, with efficiency based on a min hour. The ripper is equipped with a single shank and the ripping conditions are average ie intermediate between extreme conditions The normal O&O cost per hour, including operator, for a hp tractor with ripper is $ This is classified as heavy ripping. Using your estimate of hourly production, estimate the ripping unitproduction cost in dollars per bcy
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
