Question: 7 . ) A project requires 2 . 4 2 million BCY of common earth material to be excavated with a 5 - cy front

7.) A project requires 2.42 million BCY of common earth material to be excavated with a 5-
cy front shovel. The material will be loaded into 21-cy, loose measure articulated trucks,
and hauled 4 miles to a fill site. The trucks will average 21mphloaded, and 35mph empty.
The front shovel can excavate the common earth material at the optimum depth of cut and
at 75 average angle of swing. It will cost $5500 to transport the shovel to the job, set it up,
and return it to the storage yard. Determine the most economical number of trucks to use
that minimizes cost. Estimate the total cost and the cost per cubic yard, bank measure, for
excavating and hauling earth. Assume the shovel and trucks will operate at a 50-minhr
efficiency. The following cost information applies:
7 . ) A project requires 2 . 4 2 million BCY of

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!