Question: 7 . ) A project requires 2 . 4 2 million BCY of common earth material to be excavated with a 5 - cy front
A project requires million BCY of common earth material to be excavated with a
cy front shovel. The material will be loaded into loose measure articulated trucks,
and hauled miles to a fill site. The trucks will average mphloaded, and empty.
The front shovel can excavate the common earth material at the optimum depth of cut and
at average angle of swing. It will cost $ to transport the shovel to the job, set it up
and return it to the storage yard. Determine the most economical number of trucks to use
that minimizes cost. Estimate the total cost and the cost per cubic yard, bank measure, for
excavating and hauling earth. Assume the shovel and trucks will operate at a
efficiency. The following cost information applies:
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
