Question: 7.) Based on the network for this project, utilize Marginal Cost Analysis to demonstrate - Calculate the T(RED) and the Slope (S) for each activity

7.) Based on the network for this project, utilize Marginal Cost Analysis to demonstrate - Calculate the T(RED) and the Slope (S) for each activity - What is the total cost of the project? - Crash the project to 32 days. - What would be the extra cost incurred? (10 points)