Question: 7. Based on the network for this project, utilize Marginal Cost Analysis to demonstrate Calculate the T(RED) and the Slope (S) for each activity What

7. Based on the network for this project, utilize
7. Based on the network for this project, utilize Marginal Cost Analysis to demonstrate Calculate the T(RED) and the Slope (S) for each activity What is the total cost of the project? Crash the project to 32 days. What would be the extra cost incurred? (10 points) Activity tn (days) Cn (500) tc (days) Cc (500) T(RED) s A 3 $1000 2 $1800 B 2 $1600 5 $800 3 $1000 D $700 3 $1000 E 12 $1200 8 $2000 F 8 $1800 5 $2500 G 9 $1000 7 $2800 H 1 $700 3 $600 2 $1200 J $900 K 6 $1000 5 $1900 L 2 $600 M 1 $200 Total Project Cost = Project length = 4 Now w 4 $300 1 7. Based on the network for this project, utilize Marginal Cost Analysis to demonstrate Calculate the T(RED) and the Slope (S) for each activity What is the total cost of the project? Crash the project to 32 days. What would be the extra cost incurred? (10 points) Activity tn (days) Cn (500) tc (days) Cc (500) T(RED) s A 3 $1000 2 $1800 B 2 $1600 5 $800 3 $1000 D $700 3 $1000 E 12 $1200 8 $2000 F 8 $1800 5 $2500 G 9 $1000 7 $2800 H 1 $700 3 $600 2 $1200 J $900 K 6 $1000 5 $1900 L 2 $600 M 1 $200 Total Project Cost = Project length = 4 Now w 4 $300 1

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!