Question: 8. Given the following network, D7 A8 G5 C3 E6 Start End IXT F7 H3 9. Given the estimated activity times below and the network

8. Given the following network, D7 A8 G5 C3 E6

8. Given the following network, D7 A8 G5 C3 E6

8. Given the following network, D7 A8 G5 C3 E6

8. Given the following network, D7 A8 G5 C3 E6 Start End IXT F7 H3 9. Given the estimated activity times below and the network in Problem 8 above, Activity m b A 7.5 14.5 B 10.5 12.5 2.5 3.5 4.5 D 6.5 7.5 8.5 E 5.5 5.5 9.5 F 5.5 7.5 9.5 G 4.5 6.5 8.5 H 2.5 3.5 3.5 what is the probability that the project will be completed within (based on the path with the longest expected time): (a) 21 days? (b) 22 days? (c) 25 days