Question: A 2 . 5 m thick fill with large dimensions in plan is going to be placed over the ground, the geotechnical profile of which
A thick fill with large dimensions in plan is going to be placed over the ground,
the geotechnical profile of which is shown in Figure As can be observed, ground
profile includes a soft clay layer thick.
The results of site investigation suggest the possible existence of a continuous thin
sand layer at depth. Nevertheless, to be on the safe side, it has been decided not to
consider its effect in the project estimate for the consolidation time.
In order to allow an earlier date of pavement construction on top of the fill, it is
decided to install PVD drains equivalent radius in a square pattern with
spacing of Assume
i Calculate the primary consolidation settlement, due to the construction of fill.
ii Calculate the average radial consolidation ratio expected after months.
iii At the end of sixmonth period, a surface settlement of registered.
Assuming that all parameters of the clay layer used in the computations are correct,
check whether that settlement value confirms that the thin sand layer works as a
draining boundary.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock