Question: A 3 - phase signal controlled intersection is dessigned for a 4 way intersection with a optimum cycle length of 1 0 1 sec and
A phase signal controlled intersection is dessigned for a way intersection with a optimum cycle length of sec and actual gren times are determined to be GNSTR sec GEWTRsec and GL sec According to the given data tsl sec tcl sec
a Determine the effective green times for
each phase
b Which one of the left turns is proctedted
EWL or NSL
C Drow the phase diagram
d Determine the missing peak hour flow
rate in the flow diagrom?