Question: A 3-machine flow shop featuring the processing times above. (a) Using the Campbell-Dudek-Smith (CDS) method determine a schedule for the flow shop that minimizes make-span.

A 3-machine flow shop featuring the processing times above. (a) Using the Campbell-Dudek-Smith (CDS) method determine a schedule for the flow shop that minimizes make-span. (b) Using the results of part a, calculate the value of the make-span.
\begin{tabular}{llll} Processing times & t1 & t2 & t3 \\ \hlinem1 & 3 & 6 & 12 \\ m2 & 7 & 13 & 7 \\ m3 & 15 & 6 & 9 \end{tabular}Step by Step Solution