Question: A 3-machine flow shop featuring the processing times above. (a) Using the Campbell-Dudek-Smith (CDS) method determine a schedule for the flow shop that minimizes make-span.
A 3-machine flow shop featuring the processing times above. (a) Using the Campbell-Dudek-Smith (CDS) method determine a schedule for the flow shop that minimizes make-span. (b) Using the results of part a, calculate the value of the make-span.

Processing times t t2 12 TIL1 13 TIL2 15 6
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock