Question: A 3-machine flow shop featuring the processing times above. (a) Using the Campbell-Dudek-Smith (CDS) method determine a schedule for the flow shop that minimizes make-span.

A 3-machine flow shop featuring the processing times above. (a) Using the Campbell-Dudek-Smith (CDS) method determine a schedule for the flow shop that minimizes make-span. (b) Using the results of part a, calculate the value of the make-span.

A 3-machine flow shop featuring the processing times above. (a) Using the

Processing times t t2 12 TIL1 13 TIL2 15 6