Question: ( a ) According to the program evaluation review technique, if a project has an expected time ofQuestion 1 ( a ) A Truck contains
a According to the program evaluation review technique, if a project has an expected time ofQuestion
a A Truck contains both hydraulic brakes with reliability and mechanical brakes with
reliability Calculate the probability of stopping,
i rapidly at high speed, assuming both systems must work
marks
ii at low speed, assuming either system will stop the car
marks
b An engineered system has a hazard rate of failure per hour. What is its MTBF
Mean time between failures If the same system has an MTBM Mean time between
maintenance of hours, an MDT Mean down time of hours, and an MTTR Mean
time to Repair of six hours, then, calculate its inherent availability and operational
availability
marks
c For any engineering design of complex systems that you are familiar with, discuss the
importance of drawingdesign release management processes involving design changes.
marks
completion of weeks with a standard deviation, of weeks, calculate the probability
of completing it
i within one year weeks
marks
ii within weeks
marks
b For a company or industry, the strategic management of technology is important. Describe
the technologies that are important for their strategic management of technology.
marks
c Given the project information in the Table Q below.
i Draw an arrow network diagram
ii Show a PDM diagram
iii Show all possible paths and identify the critical path
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
