Question: a . Calculate Earned Value. b . Calculate the AC and PV . c . Calculate the CV , CPI, SV , SPI. d .
a Calculate Earned Value.
b Calculate the AC and PV
c Calculate the CV CPI, SV SPI.
d Estimate how much money is needed to complete the remaining tasks.
e Estimate forecast the total cost of the project EAC and variance at completion
f How is this project doing evaluate progress
Problem # points Consider the following AON Network for a the given small project
with activities.
a Develop an AONCPM TimeConstrained Network no consideration of limited resources with
its Start and End nodes, and calculate the ES; EF LS LF total slack, and project duration.
Use the nodes used in this class only:
b Assume that there are only TWO units of a limited resource. The quantity of units of the
limited resource required by each activity is given at the center of the "Legend" in the
AON network below. Your task is to develop a Resourceconstrained scheduleloading
chart. You may delay the original EF of the project if necessary but keep all the required
precedence relationships. Use the parallel method to schedule activities, explain what rule is
used at each step, and make sure to include at the bottom of the resourceconstrained
schedule two lines showing the number of units of the resource scheduled and the number of
units of the resource available.
c Draw a new AON Network based on the previous and final resource constrained schedule
extrapoints if no errors
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock