Question: A capacity constrained industrial process consists of 2 sequential steps. Step 2 has a total setup time of 4 0 minutes per batch while step
A capacity constrained industrial process consists of sequential steps. Step has a total setup time of minutes per batch while step has no setup time. The activity time for step is minutes per part, for step is minute per part? An entire batch must be processed at each step before the next step can begin to work on parts from that same batch.
a Assuming a batch size of what is the capacity flow rate of the entire process and what is the bottleneck?
b What batch size will yield the optimal output rate for this process?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock