Question: A. Consider a stage doing batch processing with a required setup. If the batch size increases 2 times, how would the stage capacity be affected?
A. Consider a stage doing batch processing with a required setup. If the batch size increases 2 times, how would the stage capacity be affected?
The stage capacity will likely not change.
The stage capacity will increase, but not as much as 2 times.
The stage capacity will increase 2 times.
The stage capacity will increase more than 2 times.
B. Which of the following regarding bottleneck is WRONG?
There could be more than one bottleneck in a process.
There will always be at least one bottleneck in a process.
Process utilization is higher than bottleneck utilization.
None of the above.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
