Question: A. Consider a stage doing batch processing with a required setup. If the batch size increases 2 times, how would the stage capacity be affected?

A. Consider a stage doing batch processing with a required setup. If the batch size increases 2 times, how would the stage capacity be affected?

The stage capacity will likely not change.

The stage capacity will increase, but not as much as 2 times.

The stage capacity will increase 2 times.

The stage capacity will increase more than 2 times.

B. Which of the following regarding bottleneck is WRONG?

There could be more than one bottleneck in a process.

There will always be at least one bottleneck in a process.

Process utilization is higher than bottleneck utilization.

None of the above.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!