Question: Consider a stage doing batch processing with a required setup. If the batch size increases 4 times, how would the stage capacity be affected? 1.
Consider a stage doing batch processing with a required setup. If the batch size increases 4 times, how would the stage capacity be affected?
1. The stage capacity will likely not change.
2. The stage capacity will increase 2 times.
3. The stage capacity will increase 4 times.
Which of the following regarding bottleneck is CORRECT?
1. There could be more than one bottleneck in a process.
2. After the capacity expansion, there will be no bottleneck in the process.
3. Bottleneck utilization is higher than process utilization.