Question: A control chart with six consecutive points above the upper control limit is more important than six consecutive points below the lower control limit .

A control chart with six consecutive points above the upper control limit is more important than six consecutive points below the lower control limit.
Question 9 options:
They both are indicators of potential issues.
Points below the lower control limit are less serious than points below the upper control limit.
Points above the upper control limit are more serious than points below the lower control limit.
Potential issues are not a concern until there are more than 10 either upper or lower control limits.