Question: A direct time study using the continuous timing method was used to observe the elements for a worker - machine task. Two cycles were timed.
A direct time study using the continuous timing method was used to observe the elements for a workermachine task. Two cycles were timed. Worker controlled elements include elements a b c and e Element d is machine controlled. Of the workercontrolled elements, element c is internal to the machine cycle, so c and d occur simultaneously. The observed time on the stopwatch in minutes is recorded at the end of each element in the table below. During the study, the worker's performance level for all elements was The machine allowance is and the worker's PFD allowance is Determine the normal time for the cycle. Units are "min". Clarification: Both c and d begin when element b ends.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
