Question: A llnear programming computer package is needed. Greenvile Cabinets necelved a contract to produce cabinets for a major furniture distributor. The contract calls for the

A llnear programming computer package is needed.
A llnear programming computer package is needed. Greenvile Cabinets necelved a contract to produce cabinets for a major furniture distributor. The contract calls for the production of 3,300 small cabinets and 4,100 large over the noxt two months, with the following dellvery schedule Greenvile extimates that the production time for each small cabinet is 0.7 hours and the production time for each large cabliet is 1 hour. The raw material costs are $10 for eoch smoll cablinet and $12 for each large cabinet. Labor costs are $22 per hour using mgular production time and $33 using overtime. Greenvilio hns up to 2,400 hours of regular production time avaliable each month and up to 1,000 additional hours of overtme avaliabie each month. If production for either cabinet exceeds demand in month 1 , the cabinets can be stored at a cost of $5 per cabinet. For ench product, detarmine the number of units that should be manufactured each month on regular time and on everime to minimize total production and storage costs. (Round your answers to the nearest integer Let: SaR= reguiar smali cabinets for month 1,SbR= regular smail cabinets for month 2, LaR = regular large cabinets for month 1, LbR in regular large cabineca for month 2,580= overtime small cabinets for month 1,Sb0 = overtime smat cabinets for month 2 , ta O = overtime iarge cabinets for month 1 , and LbO = overtime inrge cabinets for month 2) (SaR,SOR,LaR,LOR,SaO,SbO,LOO,LDO)=

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!