Question: A machine makes two components; call them types A and B . It takes 2 5 0 seconds to switch production between the component types.

A machine makes two components; call them types A and B. It takes 250 seconds to switch production between the component types. During that time, no production occurs. When in production, each unit of A or B requires 0.5 second to be completed. The two components, A and B, are combined in an assembly process to make a final product; call it C. The assembly step can combine the two components into 1 unit every 1.25 seconds. Suppose the machine rotates between one batch of 1000 units of A and 1000 units of B. What is the utilization of the machine?
80%
60%
50%
70%
 A machine makes two components; call them types A and B.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!