Question: . A manager wants to build 3 - sigma control limits for a process. The target value for the mean of the process is 1

. A manager wants to build 3-sigma control limits for a process. The target value for the mean of the process is 10 units, and the standard deviation of the process is 6. If samples of size 9 are to be taken, the upper and lower control limits involved will receptively be:
12 and 8
8 and 12
16 and 4
8 and 28