Question: A production equipment should work during 16 hours (two 8-hour shifts) per day. However, 30 minutes per shift is used for setting up and cleaning;
A production equipment should work during 16 hours (two 8-hour shifts) per day. However, 30 minutes per shift is used for setting up and cleaning; besides, historical records show an average of 20 minutes downtime per day. The equipment produces 25 parts per hour but 2 parts/hour are defective. The theoretical cycle time per part is 1.75 minutes.
a. What is the Loading Time?
b. What is this equipment Availability (use 3 decimals)?
c. What is this equipment Performance Efficiency?
d. What is the Rate of Quality Products?
e. What is the Overall Equipment Effectiveness?
Step by Step Solution
There are 3 Steps involved in it
a Loading Time Loading time refers to the actual time the equipment is running and producing parts It excludes any planned or unplanned downtime setup ... View full answer
Get step-by-step solutions from verified subject matter experts