Question: A project has four possible paths, as shown below with their associated path lengths. Paths Length ACF 9 weeks ACDF 1 2 weeks BDF 1
A project has four possible paths, as shown below with their associated path lengths.
Paths Length
ACF weeks
ACDF weeks
BDF weeks
BEF weeks
Every activity except activity A can be crashed for a cost given in the second table below.
Activity Crashable weeks $week cost to crash
A
B $
C $
D $
E $
F $
Determine the shortest length of time to complete the project after crashing by filling in the table below. The last rows keep track of the length of each of the paths. For each Step column: i in the nd row, enter the activity that is crashed in that step and the corresponding cost, and then ii enter the new path length for each path in the cells below. For example, if you crashed both B and C in Step which is not correct you would enter BC $ in row for Step Note that the correct answer may not use all Steps!
Determine the total cost for crashing the project:
Remember you should crash only week at a time, so each column in the table below reduces the length of the project by exactly one week. See Topic b
Step Step Step Step Step Step Step
Path Initial length
ACF
ACDF
BDF
BEF
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock