Question: A project is found to have expected time T = 35.9 days and variance V = 3.19. What of the following is/are (a) correct way(s)

A project is found to have expected time T = 35.9

A project is found to have expected time T = 35.9 days and variance V = 3.19. What of the following is/are (a) correct way(s) to calculate P(32 -2.18) d. P(-2.18 sz s 1.18) e. P(-1.18 SZS -2.18) Of. None of the other options