Question: A project manager is using Project Network Diagram to perform critical path analysis. The diagram is represented as shown in Table 1 a) Draw a

A project manager is using Project Network Diagram to perform critical path analysis. The diagram is represented as shown in Table 1 a) Draw a network diagram representing the project b) What is the critical path for this project and how long does it take? c) What is the shortest time in which this project can be completed? (Total: 10 marks)