Question: A prospective client is considering embarking on a multimillion - dollar construction development. The following developments are planned for sites situated in Windhoek: a .

A prospective client is considering embarking on a multimillion-dollar construction
development. The following developments are planned for sites situated in Windhoek:
a. A hanger for an airplane.
b. Ten storey office blocks.
c. Temporary accommodation units to house more than 200 workers.
In a report format, identify and discuss the type of structure that will be the most cost
effective for each of the above developments.
Introduction (5 marks)
Main body identify and discuss the type of structure (10 marks x 3=30 marks)
Conclusion (3 marks)
References (2 marks)
PART 2
[MARKS 40]
A location of the service core in any tall building is one of the most fundamental design
decisions, impacting efficiency, structural systems, services, environmental
performance, views, access and aggress, and more. Yet, despite the opportunities
available to the design team, the central core skyscraper has remained a ubiquitous
typology throughout history, predominantly due to the spatial and structural efficiencies
such an arrangement offers.[Source: Oldfield & Doherty, 2019).
The service core of tall buildings is classified into the following types: ----
Central core,
Perimeter core,
Mixed core,
Offset core.
Identified in the photos attached is a building least 5 storey high.
In a report format:
[10]
2.1 State and explain the type of service core used in the identified building.
2.2 Discuss how sustainability is influenced by the location of the service core in the identified building.
[10]
Introduction (5 marks)
Main body 2.1 identify (1 mark), sketching (2 marks), photographic evidence or google map
(2 marks), stating the location (1 mark), explaining (4 marks) the type of service core.
Main body 2.2 discussing sustainability of service core (10 marks)
Conclusion (3 marks)
References (2 marks)
A prospective client is considering embarking on

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!