Question: A table is assembled using three components, as shown in the accompanying product structure tree. The company that makes the table wants to ship 100

A table is assembled using three components, as

A table is assembled using three components, as shown in the accompanying product structure tree. The company that makes the table wants to ship 100 units at the beginning of day 4, 150 units at the beginning of day 5, and 200 units at the beginning of day 7. Receipts of 100 wood sections are scheduled at the beginning of day 2. There are 120 legs on hand. An additional 10 percent of the order size on legs is added for safety stock. There are 60 braces on hand with no safety stock requirement for braces. Lead times (in days) for all items are shown in the following table.' 1. Prepare a material requirements plan using lot-for-lot ordering. 2. When to release the order of wood sections and what is the ordering size? Any particular considerations required? [ Lead Time Quantity 1-2002 201-550 551-9992 le 2e 3e Table tt tt Wood sections (2) Braces (4) Legs (3) le 22 3e 12 5e 6 7 se e Periode Item Gross requirements Scheduled receipts Projected on hand Net requirements Planned order receipts Planned order release Item Gross requirements Scheduled receipts Projected on hand C e e e 2

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!