Question: A table is assembled using three components, as shown in the following product structure tree. The company that makes the table wants to ship 170

A table is assembled using three components, as
A table is assembled using three components, as shown in the following product structure tree. The company that makes the table wants to ship 170 units at the beginning of day 4. 220 units at the beginning of day 5, and 270 units at the beginning of day 7 Receipts of 170 wood sections are scheduled at the beginning of day 2 There are 210 legs on hand. An additional 20 percent of the order size on legs is added for scrap allowance. There are 40 braces on hand. Lead time (in days) for all items is a function of each order quantity and is shown below. Order Quantity 1-270 271-700 701-1,300 Lead Time (days) 1 2 3 Table Wood sections 121 Braces (3) Legs (4) Prepare the material requirements plan using lot-for-lot ordering. (Do not leave any empty spaces: input a 0 wherever it is required.) Day Production Schedule Beg Tv 4 6 2 Quantity 170 5 220 270 Bee. In Table (variable: LT) Grots requirements Scheduled receipts Projected on hand Net requirements Planned-order receipts Planned-order releases HII

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!