Question: A table is assembled using three components, as shown in the following product structure tree. The company that makes the table wants to ship 1

A table is assembled using three components, as shown in the following product structure tree. The company that makes the table wants to ship 120 units at the beginning of day 4,170 units at the beginning of day 5, and 220 units at the beginning of day 7. Receipts of 120 wood sections are scheduled at the beginning of day 2. There are 140 legs on hand. An additional 20 percent of the order size on legs is added for scrap allowance. There are 45 braces on hand. Lead time (in days) for all items is a function of each order quantity and is shown below.Order Quantity1-220221-550551-1,100Lead Time (days)1TableWood sections (2)Braces (3)Legs (4)Prepare the material requirements plan using lot-for-lot ordering. (Do not leave any empty spaces; input a 0 wherever it is required.)DayQuantityBeg. Inv.Production Schedule1234120517067220Table (*Variable LT)Gross requirementsScheduled receiptsProjected on handNet requirementsPlanned-order receiptsPlanned-order releasesBeg. Inv.Wood SectionsGross requirementsScheduled receiptsProjected on handNet requirementsPlanned-order receiptsPlanned-order releasesBeg. Inv.RrarasReg. Inv.BracesGross requirementsScheduled receiptsProjected on handNet requirementsPlanned-order receiptsPlanned-order releasesBeg. InvLegs*20% extra safety stockGross requirementsScheduled receiptsProjected on handNet requirementsPlanned-order receiptsPlanned-order releasesBeg. Inv* Note that lead time is a function of lot size.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!