Question: A tilting level was used to run precise levels to a construction project benchmark from benchmark DAM, which had an elevation of 3 4 5
A tilting level was used to run precise levels to a construction project benchmark from benchmark DAM, which had an elevation of m The line was run along a road that goes up a steep incline.
To expedite the job, backsight distances were kept to m while foresight distances were m The total length of differential levels was m The measured elevation difference was m What is the corrected project benchmarks elevation if the instrument has a sight line that declines at the rate of mm per m