Question: A time study was performed on a process that consists of the following elements: operator removes a machined part from a milling machine (and sets

A time study was performed on a process that consists of the following elements: operator removes a machined part from a milling machine (and sets it on an inspection bench), the operator then adjusts machine for the next milling cycle, loads the machine with the next part and starts an automatic cycle, and finally inspects the previously completed part (while the machine is running. Times are in minutes. Note the observed time has already been calculated into a "normal time" NT, so no performance ratings are given or necessary. Allowance %'s for each element are provided in the table.

Enter the standard time for Removed Machine PartA time study was performed on a process that

1 2 N 3 4 Element & Description Remove machined part Load machine Adjust machine with next part, for next cycle start automatic cycle inspect machined part Cycle NT NT NT INT 1 0.32 1.18 0.23 0.96 2 0.46 1.08 0.30 1.00 3 0.38 0.88 0.27 0.89 4 0.34 1.00 0.30 0.87 5 0.36 1.19 0.25 0.59 6 0.32 1.16 0.25 0.97 7 0.32 0.96 0.30 0.81 8 0.40 1.16 0.27 0.70 19 0.36 1.04 0.33 0.97 10 0.36 1.29 0.30 0.76 Summary Total NT Number of Cycles 10.0 10.0 10.0 10.0 Average NT % Allowance 10.0 12.0 12.0 12.0 Elemental Standard time

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!