Question: A utility contractor is to install a 2 6 0 ' @ 2 % sewer line. The pipe is bedded in gravel as shown below.
A utility contractor is to install a @ sewer line. The pipe is bedded in gravel as
shown below. The depth of the gravel is inches, and the pipe is bedded into the gravel
inches. The outside diameter of the sewer pipe is inches. Determine the quantity of gravel
needed for the sewer line. points