Question: A work study engineer conducted stopwatch time study on a job, for taking the observations the job was divided into 5 elements. The observations made
A work study engineer conducted stopwatch time study on a job, for taking the observations the job was divided into elements. The observations made on cycles in minutes of all the elements are shown in the table given below:
tableElementTimeminutes for cycle,tablePerformanceRating
Calculate a the normal time and b standard time for the job, if a relaxation allowance of per cent, contingency allowance of per cent and an incentive of per cent are applicable for the job.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
