Question: The work study engineer carried out the work sampling study. [ 7 ] The following observations were made for a machine shop The time duration

The work study engineer carried out the work sampling study. [7]
The following observations were made for a machine shop
The time duration of study =120 hrs
Total number of observations =7000
Number of working activities =1200
Ratio between manual to a machine elements 2 : 1
Average rating factor 120%
Total no. of jobs produced during study =800 Units
Rest and personal time for the job =12%