Question: Absolute Systems allocates manufacturing overhead based on machine hours. Each connector should require 5 machinebours According to the stand budget. Absolute espected to cut the
Absolute Systems allocates manufacturing overhead based on machine hours. Each connector should require 5 machinebours According to the stand budget. Absolute espected to cut the for 750 machine hours per month (150 connectors x 5 machine hours per connector) $9.000 in variable manufacturing overhead costs $9.450 in foxed manufacturn overhead costs During August. Absolute actually used 500 machine hours to make 100 connectors and spent $5300 in variable manufacturing costs and S. 300 in foredraacturing overhead costs Absolutes standard vaban overhead allocation rate is g O A $18.00 per machine hour OB. $12.60 per machine hour OC. $12.00 per machine hout OD. $24.60 per machine hout
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts