Question: Absolute Systems allocates manufacturing overhead based on machine hours. Each connector should require 5 machinebours According to the stand budget. Absolute espected to cut the

 Absolute Systems allocates manufacturing overhead based on machine hours. Each connector

Absolute Systems allocates manufacturing overhead based on machine hours. Each connector should require 5 machinebours According to the stand budget. Absolute espected to cut the for 750 machine hours per month (150 connectors x 5 machine hours per connector) $9.000 in variable manufacturing overhead costs $9.450 in foxed manufacturn overhead costs During August. Absolute actually used 500 machine hours to make 100 connectors and spent $5300 in variable manufacturing costs and S. 300 in foredraacturing overhead costs Absolutes standard vaban overhead allocation rate is g O A $18.00 per machine hour OB. $12.60 per machine hour OC. $12.00 per machine hout OD. $24.60 per machine hout

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!