Question: Absolute systems allocates manufacturing overhead based on machine hours. Each connector should require 8 machine hours. According to the static budget absolute expected to incur

Absolute systems allocates manufacturing overhead based on machine hours. Each connector should require 8 machine hours. According to the static budget absolute expected to incur the following:
480 machine hours per month ( connectors x 8 machine hours per connector)
$6000 in variable manufacturing overhead costs
$9560 in fixed manufacturing overhead costs
During August absolute actually used 400 machine hours to make 125 connectors and spent $5500 and variable manufacturing costs and $9600 and fixed manufacturing overhead costs absolute standard variable manufacturing overhead allocation rate is:
A.) $15.00 per machine hour
B.) $12.50 per machine hour
C.)$ 32.42 per machine hour
D.) $19.92 per machine hour

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!