Question: Activity Predecessor Optimistic Most Likely Pessimistic A 4 7 10 B 2 9 10 C A,B 2 5 8 D C 16 19 28 E
| Activity | Predecessor | Optimistic | Most Likely | Pessimistic |
| A | 4 | 7 | 10 | |
| B | 2 | 9 | 10 | |
| C | A,B | 2 | 5 | 8 |
| D | C | 16 | 19 | 28 |
| E | C | 6 | 9 | 24 |
| F | E | 1 | 7 | 13 |
| G | C | 4 | 10 | 28 |
| H | D,F | 2 | 5 | 14 |
| I | G,F | 5 | 8 | 17 |
| J | H,I | 2 | 5 | 8 |
- Determine the expected completion time for each activity.
- Construct the AON network for the activities of this contract and determine the critical path for the project.