Question: After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 10 minutes to complete. labeling requires

After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 10 minutes to complete. labeling requires 10 minutes per unit. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 10 minutes to complete. labeling requires 10 minutes per unit