Question: of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 10 minutes

of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 10 minutes to complete. two operations. Packaging and labeling requires 11 minutes per unit. percentage ta one decimal place. 2. Move time in this process could best be reduced by: a. Doing nothing. b. Changing the layout from a process orientation to a product orientation. c. Increasing batch sizes. d. Eliminating the testing step. e. Hiring mare workers. of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 10 minutes to complete. two operations. Packaging and labeling requires 11 minutes per unit. percentage ta one decimal place. 2. Move time in this process could best be reduced by: a. Doing nothing. b. Changing the layout from a process orientation to a product orientation. c. Increasing batch sizes. d. Eliminating the testing step. e. Hiring mare workers
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
