Question: An assembly line with 35 operations is to be balanced. The total amount of time required for all operations is 59 minutes. The longest operation
An assembly line with 35 operations is to be balanced. The total amount of time required for all operations is 59 minutes. The longest operation takes 2.6 minutes and the shortest takes 0.8 minutes. The line will operate for 480 minutes per day. What is the output rate if the cycle time is set at 2.6 minutes? Round the output rate to the closest whole number
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
