Question: An assembly system uses kitting, assembly, and inspection stations. There are three kitters, one automatic assembler, and one inspector. Each worker is available 7.5 hours
An assembly system uses kitting, assembly, and inspection stations. There are three kitters, one automatic assembler, and one inspector. Each worker is available 7.5 hours per day. Table 5.10 contains the set of jobs ready to be produced. To avoid leaving kits exposed, a job must be completed the same day it started. Which kits should be made today?
Table 5.10 Assembly job date for problem 5.20 Processing Time (standard hours) Job 1 Due Date Kitting Assembly Inspection 1 10.5 2.4 0.5 234 1 3.5 1 0.6 1 5.7 0.6 0.6 1 2.3 0.3 0.4 5 6 7 8 9 10 223334 23.9 4.2 3.5 4.5 1.2 1.5 2.3 1.1 0.8 4.1 0.6 3.5 12.4 4.6 7.2 10.4 2.4 0.1 11 4 18.9 5.4 4.5
Step by Step Solution
There are 3 Steps involved in it
Summary The jobs that can be ... View full answer
Get step-by-step solutions from verified subject matter experts