Question: An efficiency study showed that the rate at which the average worker assembles products t hours after starting work can be modeled by the function
An efficiency study showed that the rate at which the average worker assembles products t hours after starting work can be modeled by the function
f(t) = t2+ 12t+ 15 ,where0 t 4
Determine the number of units the average worker can assemble during the fourth hour that s/he works during a shift.
a)45 units
b)8 units
c)135 units
d)2 units
e)132 units
f)None of the above.