Question: An electronics manufacturer makes remote control devices for interactive-cable-TV systems. The company needs to complete units over a ten-hour day. The following assembly tasks must

An electronics manufacturer makes remote control
An electronics manufacturer makes remote control devices for interactive-cable-TV systems. The company needs to complete units over a ten-hour day. The following assembly tasks must be performed on each device. Attention: Upload an Excel that includes answers to the following questions. You do NOT need draw any precedence de the Excel. Task Description Predecessor Time (min.) A Place circuit into circuit frame 0.50 B Solder circuit connections to central circuit control 0.70 C Place circuit assembly in device frame 0.40 D Attach circuit assembly to device frame 0.30 Place and attach display to frame 0.30 F Place and attach keypad to frame 0.20 G Place and attach top body of device to frame 0.35 H Place and attach battery holder to frame 0.40 1 Place and attach bottom body of device to frame 0.60 Test device 0.30 > a) Assign tasks to the minimum feasible number of workstations according to the largest candidate rule". Please include the ranking table as well as the task assignment table (similar to Table 2 & Table 3 in the Excel Instruction for Problem 9.17). One way you can do is to download the Problem 9.17 Excel located in the week of March 30 as the starting point to compile your solutions. Or you can create a new Excel. b) What is the largest assigned cycle time? c) What is the efficiency (include any formula you use)? d) What is the idle time (include any formula you use)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!