Question: last two please answer An electronics manufacturer makes remote control devices for interactive-cable-TV systems. The following assembly tasks must be performed on each device. Task
last two please answer
An electronics manufacturer makes remote control devices for interactive-cable-TV systems. The following assembly tasks must be performed on each device. Task Description Predecessors) Time (min) A Place circuit into circuit frame 0.50 B Solder circuit connections to central circuit control A 0.70 C Place circuit assembly in device frame B 0.40 D Attach circuit assembly to device framec 0.30 E Place and attach display to frame 10.30 F Place and attach keypad to frame 0.20 G Place and attach top body of device to frame EF 0.35 H Place and attach battery holder to frame 0.40 0 Place and attach bottom body of device to frame GH 0.60 Test device 10.30 Draw the precedence diagram for this problem then determine the following: a. What is the sum of the task times? 4.05 minutes b. What cycle time will slow the production of 200 units over a ten hour day? minutes What is the theoretical number of workstations needed? 2 Draw the precedence diagram for this problem, then determine the following: a. What is the sum of the task times? 4.05 minutes b. What cycle time will allow the production of 200 units over a ten-hour day? 3 minutes c. What is the theoretical number of workstations needed? 2 d. What is the actual number of stations? 2 e. Was there an opportunity to improve the balance of the line based on cycle time? Yes efficiency? 25 1:45:03.7% V If so, what is the new cycle time, Idle time and 1. Based on your answer toe. what is the total idle time over the 10 hour work day. In minutes? 653

Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
