Question: An electronics manufacturer makes remote control devices for interactive-cable-TV systems. The following assembly tasks must be performed on each device. Task Description Predecessor(s) Time (min.)

An electronics manufacturer makes remote control
An electronics manufacturer makes remote control
An electronics manufacturer makes remote control devices for interactive-cable-TV systems. The following assembly tasks must be performed on each device. Task Description Predecessor(s) Time (min.) 0.50 Place circuit into circuit frame A 0.70 B Solder circuit connections to central circuit control B 10.40 C Place circuit assembly in device frame 0.30 D Attach circuit assembly to device frame a 0.30 E Place and attach display to frame 0.20 ST F Place and attach keypad to frame E, F 0.35 G Place and attach top body of device to frame 0.40 IH Place and attach battery holder to frame D G.H 0.60 Place and attach bottom body of device to frame 0.30 Test device Draw the precedence diagram for this problem, then determine the following: minutes a. What is the sum of the task timesOS Draw the precedence diagram for this problem, then determine the following: minutes a. What is the sum of the task times? 4.05 b. What cycle time will allow the production of 200 units over a ten-hour day? 3 minutes c. What is the theoretical number of workstations needed? 2 d. Balance this assembly line using the heuristic longest operation time, what is the actual number of stations? 2 e. What is the efficiency based on your answer to letter 207.5% f. How much idle time is in this process based on the longest operation time? Select minutes

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!