Question: an engineer is designing the cycle length for the intersection of 5 th street and 1 2 th avenue. The total loss time is 1

an engineer is designing the cycle length for the intersection of 5th street and 12th avenue. The total loss time is 12 seconds. There are currently 3 phases and the critical flow ratios are .16,0.34, and 0.16 for phases 1,2, and 3 respectively. What is the total cycle length after rounding up the nearest 5 seconds?