Question: An engineer must design a process that will check every third can on an assembly and remove those that are damaged. The assembly is empty

An engineer must design a process that will check every third can on an assembly and remove those that are damaged. The assembly is empty at the start of the process, it is waiting for the first can to be moved in. A logical process overview is shown below: Line 10: Counter=0 Line 20: Counter= Counter+1 Line 25: Move assembly line 1 can forward Line 30: XXXXX , Line 40: Examine can, Line 50: If can is damaged then remove it from assembly line, Line 60: Goto Line 10. Which statement can substitue XXXXX

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Databases Questions!