Question: An engineering workshop which fabricates window frames has set a target to complete 2 0 0 frames every month in 2 0 2 2 .

An engineering workshop which fabricates window frames has set a target to complete 200 frames
every month in 2022. The following data from the last 18 months is available. Plot a Z-chart (manually, no excel) to help
the manager of the workshop track the fabrication progress at the end of June 2022.
 An engineering workshop which fabricates window frames has set a target