Question: An existing bread factory has the production process shown in the figure below. Manufacturing bread must be processed through each of the three operations (

An existing bread factory has the production process shown in the figure below. Manufacturing bread must be processed through each of the three operations (mix, bake, pack) in sequence. The mixer can mix enough ingredients for 100 loaves of bread every 15 minutes, the oven is capable of baking 100 loaves of bread every 20 minutes, and the packing machine can handle a batch of 100 loaves of bread every 12 minutes.
a. Please draw the process flow chart for the process described above. What is the throughput time for a single loaf of bread at this facility?

Step by Step Solution