Question: An intersection operates on a two - phase signal. Field measurement shows that start - up lost time is 4 seconds and clearance lost time
An intersection operates on a twophase signal. Field measurement shows that startup lost
time is seconds and clearance lost time is seconds in each phase. In addition, when
vehicles travel through the intersection at full speed, their saturation headway is seconds
per vehicle. Traffic demand is given as shown in the figure. Assume volume to capacity ratio
In addition, approach speed is on street wide and in
street ft wide the intersection is on level terrain, and vehicle effective length
Find the practical cycle length that is able to accommodate the traffic demand.
Determine phase splits for each phase.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock