Question: answer all parts in boxes and regervto dropdown for mcqs A B D E F G 8 5 7 The mandatory pre-hire physical examination given
answer all parts in boxes and regervto dropdown for mcqs
A B D E F G 8 5 7 The mandatory pre-hire physical examination given to prospective pilots navigators by the physicians at Yukon Airlines involves the following seven activities Activity Activity Description Average Time (mins) Medical History 10 Blood Tests Eye Examination Measurements (ie weight, height, blood pressure) Medical Examination 16 Psychological interview 12 Exit medical evaluation 10 These activities can be performed in any order with two exceptions Medical history (A) must be taken first, and Ext medical evaluation (G) is last At present, there are three paramedics and two physicians on duty during each shift. Only physicians can perform exit evaluations (G) and conduct psychological interviews (F) Other activities can be carried out by either physicians or paramedics a) The correct precedence relationship with the assignment of tasks to workstations that minimizes the cycle time is shown in below/where Par 1 Par 2 and Par 3 represent the three paramedics and Ph 1 and Ph 2 represent the two physicians) a Fig. 1 Fig. 2 Fig 2 Fig 3 Por 1 Ph 2) Fig. 1 Par Ph F Phr Phr. Ph.2 Ph. 2 Fig. 3 Par Ph 2 Par There are 5 workstations Three are managed by the paramedics and are the other two are managed by the physicians Given the five workstations, the least possible cycle time is minutos (enter your response as a whole number) b) The number of people that can be processed using the assembly line in an hour is people (round your response to two decimal places) C) The activity that is the current bottleneck is d) For the assembly line, the idle time per cycle is minutes (enter your response as a whole number) to reduce the cycle time e) If an extra paramedic was available, the paramedic should be assigned to activity on: 1 point(s) possible . Subm Ph F Phir. 1P . Ph. 2 Phr. 11 Ph. 2 3 F B Par B F Par D Ph 2 A E G ere are 5 workstations Three are managed edics and are the other two are managed by the physicians Given the five workstations, the least sible cycle time is minutes (enter your whole number) The number of people that can be processo Esembly line in an hour is people fround your response to two decimal places) The activity that is the current bottleneck is For the assembly line, the idle time per cycle is minutes (enter your response as a whole number) an extra paramedic was available the paramedic should be assigned to activity to reduce the cycle time B PL 1 CE Phr. 1 Phr plu. 2 Ph. 2 Phr. 1 A Ph. 2 Fig. 3 Par 21 Par Par h2 G F B D ere are 5 workstations Three are managed by the paramedics and are the other tv ed by the physicians Given the five workstations, the least ssible cycle time is minutos (enter your response as a whole number) The number of people that can be processed using the assembly line in an hour is bund your response to two decimal places) The activity that is the current bottleneck is For the assembly line, the idle time per cycle is minutes (enter your response If an extra paramedic was available, the paramedic should be assigned to activity yo reduce the cycle time E A mbor)



Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
